|
Pledged: $6,750,381
Pledges: 801
Received:$4,642,633.68
as of May 5, 2008
BodyBuilding Update - 7/23/2007
Extreme Makeover: Buildings A & B

Entrance to Building A
Buildings A and B have been a flurry of activity as a design team, artists and a number of servant ministers have been working on
the renovation of Buildings A and B thanks to a gift to the BodyBuilding campaign. The design team made up of Meredith Barnes, Joanne Dorr, Amanda Knight, John Stiles Williams and
Mark Wollard has been meeting since May and last month turned
the buildings into a giant coloring book with murals designed by
artist Chad Thompson.

Building A Hallway
The team was charged with coming up with a theme and
transforming the buildings into a fun, multi-functional space that is child-friendly and exciting. To find out what kids like, go to the source. The theme God-o-sea came as a suggestion from 7 year old Caroline Stiles Williams.

Building B Hallway
The first floor of the design will bring the Bible to life with murals of Moses parting the waters, Noah’s ark and a seaside resort on the Sea of Galilee. The upstairs gathering space will be turned into a cool surf shack and the hallways upstairs will help all surf the scriptures in a fun way.

Building B Hallway
If you would like to help please contact Mark Wollard at 407-876-4991, ext. 235.

Room A201
Building B Upstairs Hallway
Previous BB Updates
|