Watch the 3-D Video Fly-Thru Click Here!

The new Gathering Hall will enter through the new rotunda (shown above) and will connect the Gathering Hall to the current Building C. The above view is looking at the new space from the cross at the turnaround.

The new Welcome Hall will connect to the current Welcome Hall in Building C. A welcome center will be in the rotunda connecting these two buildings. The Gathering Hall will be home to Contemporary Worship, as well as a space for capacity of 800 for round table dining or other events. As a worship space it can hold up to 1200. The Gathering Hall can also be made into several rooms and meeting spaces.

Aerial shot of the new campus.
 Aerial shot of campus from Apopka-Vineland Rd.

Inside the new Gathering Hall which connects to the Welcome Center and Welcome Hall of Building C. The auditorium where Contemporary worship and other events will be held is through the doors at the end of the hallway to the right.
 Inside the Gathering Hall auditorium. The auditorium will hold 1200 in worship style seating, and 800 in round tables.
 Inside the Gathering Hall auditorium.
 A sample of the new classrooms in the new Chilren's Building.
 A view of the new children's library which will be attached to the back of the new Children's Building.
|